– from Calculations to Risk-based maintenance – for Power Utilities of all types.
The Suite reduces number of power outages and blackouts through early proactive diagnostic of hidden failures in protection devices and systems.
PLS saves:
↓25-50% OPEX on Protection maintenance
↓80-100% errors during protection configuration process
↓50-80% man-hours due to Relay lifecycle processes automation
Automate settings calculation and keep wide-area protection coordination check in on-line mode. Navigate system planning experts and dispatchers with automated operation recommendations.
PLS saves:
↓50-75% time on fault events analysis
↓80-100% man-hours during system operation planning under protection constraints
↓500-800% efforts on protection settings calculation and verification processes
↑50-100% system observability and situational awareness increase due to instantaneous monitoring
- Complicated generator protection devices with a lot of specific functions
- DC, 0.4 and 6-35 kV auxiliary supply systems
PLS saves:
↓25-50% OPEX on Protection maintenance
↓50-80% man-hours due to Relay lifecycle processes automation
↓50-75% time during location of hidden failures within protection system and devices